I had to sneak in a pic of the foreman overseeing the drying of the stone - or was he trying to camouflage himself in?
By the way - here is a lovely shot of the succulents I was recently given by some friends who are leaving the country - don't they look great on the front steps:
Anyway - it turned out that since the weather was 96% humidity (what with all the rain etc) the tiles weren't drying so I decided to bring them in the house.
To accelerate the drying process I turned to the heat gun which was working a treat:
But after the first tile the trusty heat gun died a sudden death and it was back to square one for me... Since we have ordered our new stove/oven/cooktop (but haven't received it yet) the days are numbered for my existing oven. So I threw caution to the wind and turned my oven in to a mini-kiln:
Within a few hours I had dried out all the tiles and could see their true colours which was lovely!
The next step will be to glue them to the fibro board we have on the floor. We are going to try to tile around the heater and gently lift and tilt it to slide the tiles under-neath the feet. It is going to be touch and go as the unit weighs an awful lot and the cute little feet mean that the pressure and weight is concentrated on to a small and sharp cast iron point but we are going to try anyway.
So I painted some curing agent on to the fibro in preparation for the actual fixing of the tiles:
At the same time, Ola had been measuring the position for the flue and together we managed to map out the pathway for the flue up through the ceiling, through the floor, up through the rumpus room upstairs, through the ceiling upstairs, in to the roof cavity and to the colourbond of the external roof. With all the rain we have had we haven't been able to cut through the actual roofing iron but we have started to cut the holes to fit the flue:
The offending beam is the one with the small section bored out of it - this was our test drill hole which identified that the beam was in fact there...
So we have called it a day but tomorrow we will reinforce this floor beam with some supports to either side and then cut through it in order to make way for the flue. If the rain will let up for a couple of hours tomorrow we might even get the flue through to the outside.
In the meantime I need to finish the hearth which could be another challenge in itself... According to Wikipedia (who never lies), Travertine is actually quite a soft stone so it remains to be seen if we will be able to position the feet of the heater one at a time on to the stones as we tile around the unit...
Oh the joys - it will be great when it is done though!